CTR – UBER

The CTR-UBER trailer was built specifically for high pressure deep formations in the Liard, Horn River Basin, Montney, Eagleford and Bakken. With its robust engineered design and independent mounted powerpack, the CTR-UBER is capable of handling all milling and initial completion requirements, as well as re-entry applications targeting re-stimulation of depleting wells and deep annular fracs.

Some of the major benefits:

  • 15,000 PSI HPHT
  • Extended reach high rate annular fracs
  • Conventional extended reach milling
  • Conventional extended reach cleanouts
  • 15% – 28% HCL acid stimulations
  • Capacity of 7200m of 2 3/8” or 5800m of 2 5/8” coiled tubing

 

CTR – UBER – Spec Sheet

CCT – Optimizer

The CCT – Optimizer is the coiled tubing unit of the Montney, Cardium, Deep Basin, Bakken, Marcellus, and Rockies. The CCT – Optimizer is capable of operating various coiled tubing sizes up to 5,000m of 2.0”. It is suited for a variety of interventions including, but not limited to, cleanout of wells with decreased production, millout of wellbore restrictions, matrix acidizing, solvent circulations and production logging.

Some of the major benefits:

  • Small footprint on location
  • Quick transition to different coiled tubing sizes
  • Absolute hydraulic system for added reliability
  • Quick and efficient rig up
  • State-of-the-art Caliber Coil acquisition and monitoring system

 

CCT – Optimizer – Spec Sheet