High Rate Annular Marcellus

Home 9 Project Category: Coiled Tubing

High Rate Annular Marcellus

Categories: Coiled Tubing, Fracturing

Calfrac’s Smithfield, Pennsylvania operation performed above and beyond customer expectations on the first annular coiled tubing fracturing completion technique executed in the Pennsylvania Marcellus Basin. Using NCS Multistage casing sleeves, the treatment was performed with Calfrac’s CWS-600 Slickwater System.

High Pressure Annular Coiled Tubing Fracturing

Home 9 Project Category: Coiled Tubing

High Pressure Annular Coiled Tubing Fracturing

Categories: Coiled Tubing, Fracturing

Formations in the Western Canadian Sedimentary Basin are continuously being completed in the pursuit of optimizing sand placement during hydraulic fracturing operations. Typical fracturing techniques in the Montney and Cardium area have included placing proppant into clusters between zones, which does not homogeneously distribute stimulation fluid between the multiple perforation intervals.

High Rate Annular Montney

Home 9 Project Category: Coiled Tubing

High Rate Annular Montney

Categories: Coiled Tubing, Fracturing

Calfrac has specifically designed surface equipment and operating procedures to complete a +6,000m annular fracturing operation beyond the previously defined 10,000 psi pressure limitation.

High Rate Annular Cardium

Home 9 Project Category: Coiled Tubing

High Rate Annular Cardium

Categories:Coiled Tubing, Fracturing

Calfrac has done extensive research and incorporated theoretical and empirical results to extend pumping rates with annular fracturing to 7m3/min in 4.5” casing and to 10m3/min in 5.5” casing.